What Does the Same Change Cost at Conceptual, Detailed Engineering, and Construction?

Benefits of Understanding Change Costs:

  1. Cost Estimation Accuracy:

    By understanding the cost implications at different project stages, stakeholders can make informed decisions and accurately estimate the budget required for any proposed changes.

  2. Risk Mitigation:

    Knowing the potential cost variations between conceptual, detailed engineering, and construction phases allows project teams to identify possible risks and plan accordingly to minimize any negative impact.

  3. Efficient Resource Allocation:

    Understanding change costs helps in allocating resources effectively, ensuring that the right amount of time, labor, and materials are allocated to each stage of the project, optimizing efficiency.

  4. Enhanced Decision Making:

    With a clear understanding of the change costs, project teams can make well-informed decisions, considering the financial aspects alongside other project constraints like time and quality.

Conditions for Using Change Cost Analysis:

  1. Construction Projects:

    This analysis is particularly relevant for construction projects

Title: In Step-Pyramid and True Pyramid Construction, What is Built First? SEO Meta-description: Discover the fascinating world of step-pyramids and true pyramids in construction. Find out what crucial element is built first in these ancient structures. Learn more about pyramid construction techniques and their historical significance. Introduction When it comes to the construction of step-pyramids and true pyramids, one may wonder what is built first. These awe-inspiring structures have captivated the world for centuries and continue to spark curiosity about their construction techniques. In this article, we will delve into the world of pyramid construction, exploring the order in which elements are built and unraveling the mysteries behind these magnificent monuments. 1. The Foundation: Setting the Stage for Greatness The first crucial element in both step-pyramid and true pyramid construction is the foundation. Every magnificent structure must have a solid base to support its weight and withstand the test of time. In the case of pyramids, immense care is taken to ensure a sturdy foundation. Builders meticulously level the ground, removing any unevenness and preparing it for the construction process. This is a vital step to create a strong and stable structure. 2. Step-Pyramid Construction: Ascending towards the Heavens 2.

What is a conceptual estimate in construction?

Conceptual estimating is the first predesign effort made to determine a project's cost and is usually a part of the feasibility analysis of a project. It tells the owner the anticipated costs before contemplating a project's feasibility and further development.

What are the three types of construction cost estimates?

What are the Three Types of Construction Cost Estimates?
  • Design Estimates. Design estimates are first prepared at the very outset of a project – during the pre-design and design phases of the project.
  • Bid Estimates.
  • Control Estimates.

What is the concept and construction of project cost?

Project Cost is the total funds needed to complete the project or work that consists of a Direct Cost and Indirect Cost. The Project Costs are any expenditures made or estimated to be made, or monetary obligations incurred or estimated to be incurred to complete the project which are listed in a project baseline.

What is conceptual cost?

Conceptual cost estimating is done during the pre-construction stage of a project. The estimate gives the owner greater insight to manage the overall cost control program. The conceptual cost estimate will provide the first check against your project budget.

Who makes a conceptual estimate?

Estimators and preconstruction professionals can prepare conceptual estimates within minutes and at a relatively low cost because the bar for research and accuracy is not very high. This speed is important because they may need to create several conceptual estimates for a particular project.

What are the three 3 type of construction cost estimates?

Cost estimates are broken down into three categories that serve one of three basic functions: design, bid, and control.

Frequently Asked Questions

What is the estimating process in construction?

In construction, estimation is the process of forecasting the costs of building a structure. The estimating process may span several phases of a project, mirroring concept, schematic design, design development, and final construction documents. Estimation is typically handled by the general contractor.

How to do a rough estimate?

4 tips to roughly estimate project costs
  1. Collect historical cost data. Gather historical information from other projects you completed earlier.
  2. Determine location factors.
  3. Distinguish labor and material costs.
  4. Define project scope correctly.

How do you calculate construction estimate?

When creating a construction cost estimation for a project bid, data from the project's construction documents like the design estimate, subcontractor's quotes, quantity takeoffs – material costs, construction processes, direct and indirect costs and your profit margin are used to make a more detailed cost estimate.

What is the opinion of probable construction costs?

Opinion of Probable Construction Cost means a level one Cost Estimate to facilitate budgetary and feasibility determinations, based on historical information with adjustments made for specific Project conditions, wherein estimates are based on costs per square foot, number of rooms/seats, etc.

What does cost mean in construction?

Construction costs (sometimes called “hard costs”) are costs associated with the contractor and anything the contractor purchases. In other words, these are the costs of labor and materials. These costs may include: Contractor fees. Subcontractor fees.

What is an opinion of cost?

An opinion of cost estimate is an estimate for an upcoming project that is still in the planning or conceptual stages. It is a high level overview of a complex project that includes initial pricing opinions that are likely to change as the project develops.

Was the Step Pyramid the first pyramid built?

The Step Pyramid of Djoser, constructed at Saqqara about 4,700 years ago, was the first pyramid the Egyptians ever built. The ancient Egyptian pharaoh that gave the pyramid its name, Djoser, sometimes spelled Zoser (though he was actually called Netjerykhet) ruled during Egypt's third dynasty.

What is the difference between step pyramids and true pyramids?

Step pyramids differ from the famous Pyramids of Giza, which are considered the 'true' pyramids. Step pyramids are smaller and usually flat on top with sides that look like steps. The 'true' pyramids built later on, during the 4th dynasty, had smooth sides and a pointed top.

What is the first step to building a pyramid?

Phase 1: Choosing the perfect building site

The first step in building a pyramid was to choose a suitable site. This had to be on the west side of the Nile where the Sun would set, considering that Ancient Egyptians believed that wherever the sun sets that's was the portal to the afterlife.

What was the first type of pyramid built?

Step Pyramid

Around 2780 BCE, King Djoser's architect, Imhotep, built the first pyramid by placing six mastabas, each smaller than the one beneath, in a stack to form a pyramid rising in steps. This Step Pyramid stands on the west bank of the Nile River at Sakkara near Memphis.

Is the Step Pyramid older than the Great Pyramid?

TORONTO — Archaeologists working near the ancient settlement of Edfu, in southern Egypt, have uncovered a step pyramid that dates back about 4,600 years, predating the Great Pyramid of Giza by at least a few decades.

How accurate is a ballpark estimate?

Should You Bank on a Ballpark Estimate? Because a ballpark estimate is a rough guess, it should not be taken with much authority. Ball park estimates have been known to vary substantially from a “Detailed Estimate” by as much as 50%-80% because of the many unknowns within the project.

What is inaccurate cost estimation in construction?

An inaccurate cost estimate can be detrimental to a business and even marginal errors can be costly. Such inaccuracies often result in nasty cost overruns and your projects stalling. Most importantly, poor construction estimating will likely lead to an unhappy client which could damage your reputation in the long run.

What is ballpark estimate in construction?

A ballpark estimate, is a rough initial estimate based on high level client objectives, and a large margin of uncertainty. The deliverables are not clear yet, therefore out of necessity, this estimate must be a rough guess. A ballpark estimate should be a price range, rather than a fixed fee.

What is the ballpark calculation?

A ballpark figure is a rough numerical estimate or approximation of the value of something that is otherwise unknown. Ballpark figures are commonly used by accountants, salespersons, and other professionals to estimate current or future results.

What is the ballpark range?

Ballpark noun [C] (ACCEPTABLE RANGE)

an acceptable range in the amount or number of something when you do not know or cannot agree on an exact amount or number: I'd sell the house for $500,000, but his offer isn't even in the ballpark.

What are the 4 parameters of project management?

Project parameters define the scope, budget, schedule, and quality of the project. There is an interrelationship among these parameters. If you choose to increase the scope, you must also increase the schedule or budget.

What are the four main factors that should consider when estimating?

Accuracy, scope, risk, and time are four essential factors to consider when estimating. To ensure a successful estimate, it is important to collect authentic information, define the scope of the project, check potential risks, and estimate the total time.

What are the 4 project estimation steps?

The four steps to accurate estimation are defining the project scope, breaking tasks into measurable units, estimating resources needed for each task, and developing a timeline.

FAQ

What are the 4 levels of estimating?

Cost estimate classifications

Estimate classNamePurpose
Class 4IntermediateConcept study or feasibility
Class 3PreliminaryBudget, authorization, or control
Class 2SubstantiveControl or bid/tender
Class 1DefinitiveCheck estimate or bid/tender
What are the parameters for construction project?

The criteria are Time, Cost, Quality, Safety, Client's Satisfaction, Employees' Satisfaction, Cash-flow Management, Profitability, Environment Performance and Learning and Development. The paper stresses the need for a long- term perspective rather than having a short-term perspective of Construction Project Success.

What are the 4 stages of the bidding process?
The Bidding Process
  • Step 1: Request For Proposals. owners or project teams first need to issue a request for proposal (RFP) or invitation to bid (ITB) to initiate the bidding process.
  • Step 2: Bid Preparation Of Interested Parties.
  • Step 3: Bid Evaluation And Selection.
  • Step 4: Contract Negotiation And Awarding.
What are the 5 steps in the process of bidding?
The necessary steps are:
  • Bid Solicitation.
  • Bid Submission.
  • Bid Selection.
  • Contract Formation.
  • Project Delivery.
What are the two types of bids?

There are two types of bidding in procurement: open or competitive bidding, and closed (“sealed”) or noncompetitive bidding. Competitive bidding takes place usually through the RFx process, which is detailed below. In contrast, some companies will also use noncompetitive bidding.

What is a lump sum in construction?

A lump sum contract, sometimes called stipulated sum, is the most basic form of agreement between a contractor and a customer. A lump sum contract or a stipulated sum contract will require that the contractor agree to provide specified services for a stipulated or fixed price.

What are the three types of bids?

Bids can be made live, online, through brokers, or through a closed bidding process. Types of bids include auction bids, online bids, and sealed bids.

What are the 5 levels of cost estimation?

The American Society of Professional Estimators (ASPE) defines estimate levels in the reverse order as Level 1 – Order (Range) of Magnitude, Level 2 – Schematic/Conceptual Design, Level 3- Design Development, Level 4 – Construction Document, and Level 5 – Bid.>.” ACostE defines a Class I Estimate as definitive, a Class

What is a Class 1 estimate in construction?

Class 1 estimates are prepared in great detail, and thus are usually performed on only the most important or critical areas of the project. All items in the estimate are usually unit cost line items based on actual design quantities.

What are the six levels of construction cost estimates?

The American Society of Professional Estimators (ASPE) defines estimate levels in the reverse order as Level 1 – Order (Range) of Magnitude, Level 2 – Schematic/Conceptual Design, Level 3- Design Development, Level 4 – Construction Document, and Level 5 – Bid.>.” ACostE defines a Class I Estimate as definitive, a Class

What is a probable construction cost estimate?

Opinion of Probable Construction Cost means a level one Cost Estimate to facilitate budgetary and feasibility determinations, based on historical information with adjustments made for specific Project conditions, wherein estimates are based on costs per square foot, number of rooms/seats, etc.

How are construction costs determined?

In general, construction estimators follow a process that begins with reviewing bid documents, including construction specifications and contract documents, and includes steps to account for every known cost, including materials, labor, insurance, and overhead.

Is building construction estimating the determination of probable construction costs of any given project?

Construction estimating is the process of assessing the total cost of a construction project by considering all the possible expenses. Accurate estimating is critical in creating and maintaining a feasible budget of project costs. This includes direct costs such as labor, materials and equipment.

What is cost estimation in construction projects?

Construction cost estimating is a comprehensive calculation to determine the total budget needed to complete a project. As important as any other phase, your preconstruction estimate directly affects the goal to make money at the end. But there are no shortcuts to a profitable endgame.

What is a rough cost estimate in construction?

A Rough Cost Estimate is an initial estimate that uses prior experience and other non-project data to estimate the cost of a project. It is also called a Rough Order of Magnitude (ROM) estimate, or a Conceptual Estimate.

How do you accurately estimate construction costs?
8 steps in construction estimating
  1. Review bid package.
  2. Conduct a site visit.
  3. Perform a material takeoff.
  4. Solicit pricing from suppliers and vendors.
  5. Evaluate labor requirements.
  6. Determine insurance and bonding costs.
  7. Calculate overhead and indirect costs.
  8. Account for profit and contingency.
What is the most common way for contractors to estimate costs?

Bidding

The most common estimate is the one for bidding. These estimates must have a high level of detail and accuracy. They determine not only who will get the project but also whether that company will turn a profit at the end. You will also usually include prices from subcontractors.

Who estimates the cost of a construction project?
Professional construction estimators perform this essential step in the preconstruction process, which helps ensure that owners and contractors are able to complete a construction project profitably.

What does the same change cost at conceptual, detailed eng and construction

Who is responsible for cost estimation? A cost estimator is responsible for estimating the costs of a large-scale project, and must first collect and analyze project-specific data that will help them prepare estimates.

Who is a construction cost estimator?

In building construction, cost estimators use software to simulate the construction process and evaluate the price of design choices. They often check databases and their own records to compare the costs of similar projects.

Who can estimate the costs of a building?

METHOD 3: USE A QUANTITY SURVEYOR

Their estimates on a job are still exactly that – estimates but it's based on market rates and up-to-date experiences on how much things cost.

How do you create a construction cost database? Tips for Building a Construction Cost Database
  1. Make names as short and obvious as possible and use CamelCase.
  2. Start as generic as possible and only add new variables as they are needed.
  3. A variable can only be asked once in an assembly, no matter how many times it is used.
How do you keep track of construction costs? 8 Methods to track construction project costs and increase profitability
  1. Start with an Accurate Budget.
  2. Break the Project into Parts.
  3. Manage, Track & Document Project Changes.
  4. Track Staff Time.
  5. Understand what things cost.
  6. Committed Costs.
  7. Be a Negotiator.
  8. Use Project Accounting Practices.
How do you measure construction costs?

The basic formula to calculate construction cost per square feet is: Cost of construction = area of plot x construction rate per sq ft.

What is cost database in construction?

A cost database is a computerized database of cost estimating information, which is normally used with construction estimating software to support the formation of cost estimates. A cost database may also simply be an electronic reference of cost data.

In step-pyramid and true pyramid construction what is built first

The adaptations to the original step pyramid design were made by filling in the steps with limestone encasing, converting it into the first true pyramid.

At which project phase do we first need to estimate construction costs?

You need to begin the cost estimation process well before construction starts, while it is still in the idea stage. If you have no concept of the project's costs, then you can't give an accurate quote, or make a winning bid.

At what stage of the project the preliminary estimate was prepared?

Conceptual stage

Preliminary Estimate

This estimate is also known as a Design Development Estimate. It will provide a ballpark figure for your client as to what you estimate the probable cost of the project will be. It takes place in the conceptual stage, after your initial plans and estimates have been drawn up.

What is a preliminary cost estimation in construction?

Preliminary cost estimation

A preliminary estimate, also called an abstract cost estimate, approximate cost, or budget estimate, is used in the early phases of a project, usually before design documents have been completed.

When should costs estimates be prepared on a design build project?

At a minimum, project owners should consider estimating construction costs after the schematic design phase, several points during design development, and the construction documentation phase.

What are the phases of construction estimating?

In construction, estimation is the process of forecasting the costs of building a structure. The estimating process may span several phases of a project, mirroring concept, schematic design, design development, and final construction documents.

What are the two types of estimates in construction?

And when it comes to construction cost estimates – there are various types of construction estimates. Estimates of construction costs may be made in two ways: either exhaustively, taking into account every possible variable (known as a detailed estimate), or approximatively, with less attention paid to specifics.

What are the methods of estimating used in construction?

Estimating Methods. There are four primary methods used to estimate construction costs. Those methods are known as Project Comparison Estimating or Parametric Cost Estimating, Area & Volume Estimating, Assembly & System Estimating, and Unit Price & Schedule Estimating.

Which software is commonly used for preparing estimate? STACK can be used for takeoffs, cost estimates, document management, and basically any part of the preconstruction process. With a user-friendly interface and accurate cost data, STACK is considered one of the most convenient estimating solutions for smaller contractors.

What are the two methods of estimating?

Unlike top-down estimation, the bottom-up estimation method looks at individual phases of the project first in order to define the overall timeline or cost. Bottom-up estimation is often preferred over top-down estimation since the people doing the work are the same ones setting the timeline and budget.

What is the difference between a construction quote and an estimate?

If a quote is accepted, the work must be completed at that price. An estimate is an approximation of cost to help the client understand a general idea of what the total cost of a project or parts of a project might be. A written estimate usually includes more than just costs: Timeline and dates.

  • What is the construction project estimate?
    • A construction estimate is a document that lays out, in detail, all of the costs involved in a construction project. A good construction cost estimate will provide both the construction manager and the client with an idea of the cost of the project so there are no surprises when the project is completed.

  • What is the difference between a cost plan and a project estimate?
    • A cost estimate provides a single snapshot of the estimated final construction cost of a project, during a point in time in the development of design. A cost plan is a more strategic document and can consist of series of cost estimates which are formed at various stages of design development.

  • What is the difference between estimate and planned?
    • The plan is an in-depth proposal of something that is to be made or achieved. And in construction, it is the thorough skeletal description of a building or structure that is to be built. Estimation is outlining a rough idea of the costs involved in the process of constructing the building.

  • What should a construction estimate include?
    • A contractor's estimate should include:
      • Itemized costs of materials.
      • All labor costs.
      • Costs of hiring any subcontractors.
      • Estimated total before taxes and fees.
      • Taxes and fees.
      • Profit and overhead.
  • How do you estimate a construction bid?
    • 10 Steps for Accurate Construction Job Estimation
      1. Get a Precise and Detailed Scope of the Project.
      2. Use Stick Estimating to Gauge Costs.
      3. Become Familiar With Calculating Costs by Hand.
      4. Use Unit Cost Estimating for Speed.
      5. Incorporate Estimating Software Appropriately.
      6. Calculate Costs for Labor and Materials.
  • How do you structure a construction bid?
    • What to include in a construction bid.
      1. Your company information. Include company names, individual names, contact information, phone numbers, and addresses.
      2. Project scope.
      3. Cost estimate.
      4. Payment terms.
      5. Work schedule.
      6. Relevant accompanying documents.
      7. Signatures.
  • How do you estimate the cost of a construction project?
    • When creating a construction cost estimation for a project bid, data from the project's construction documents like the design estimate, subcontractor's quotes, quantity takeoffs – material costs, construction processes, direct and indirect costs and your profit margin are used to make a more detailed cost estimate.

  • How do you calculate bid price for a project?
    • Estimation of bid price or tender cost of a construction project is calculated as the sum of the total cost of construction and mark-up price.

  • What makes a good construction estimator?
    • Detail Oriented

      Attention to detail is important to ensure cost estimators achieve accurate results. They need to be able to identify cost drivers quickly and make sure that when one cost changes, they know how it will affect other costs related to the project.

  • What were the major construction challenges of the pyramid?
    • Transport of stone blocks. One of the major problems faced by the early pyramid builders was the need to move huge quantities of stone.

  • What was the problem with building pyramids?
    • It's a question which has long baffled historians. The Great Pyramid of Giza contains 2.3 million individual blocks of stone, meaning one block would have to be laid every five minutes of every hour, 24 hours a day, for the entire 20 years. The problem? Each block weighs at least 2 tons.

  • How difficult was the process of building the pyramids?
    • But the process of building pyramids, while complicated, was not as colossal an undertaking as many of us believe, Redford says. Estimates suggest that between 20,000 and 30,000 laborers were needed to build the Great Pyramid at Giza in less than 23 years.

  • What is the main reason for the construction of pyramids?
    • Pyramids today stand as a reminder of the ancient Egyptian glorification of life after death, and in fact, the pyramids were built as monuments to house the tombs of the pharaohs.

  • What was the problem with the pyramids in Egypt?
    • One of the many challenges for the builders of the Pyramids would have been to make a structure that rises beautifully and accurately to its apex. The silhouette of a pyramid is dominated by its edges. It must have been of the utmost importance to the builders that these edges be constructed as straightly as possible.

  • What are the different types of construction estimates?
    • Types of construction cost estimates. There are five main types of construction cost estimates: preliminary, detailed, quantity, bid, and control. Each is used for a different purpose at a different time in a project lifecycle.

  • What are the two stages involved in pricing an estimate?
    • Stage 1 − It is the starting phase and during this stage, a general list of all items required is prepared. This phase is also known as take off phase since take off of all items in the bid package is done. Stage -2 − In this phase the price of all the items in the list is calculated.

  • What are the methods of estimating used in construction projects?
    • Estimating Methods. There are four primary methods used to estimate construction costs. Those methods are known as Project Comparison Estimating or Parametric Cost Estimating, Area & Volume Estimating, Assembly & System Estimating, and Unit Price & Schedule Estimating.

  • What are the two main types of estimation?
    • There are two types of estimates: point and interval. A point estimate is a value of a sample statistic that is used as a single estimate of a population parameter.